Eggs per day in. Breaker, grader and washing line that match your supply out.
Open calculator →
How it works
From enquiry to commissioning
You send your requirements
Raw material, target product, capacity, local voltage and frequency, heating source and destination port. If you are not sure about some of these, tell us what you do know.
We send a process proposal
A process flow, an equipment list with specifications, a suggested layout and a quotation. If more than one configuration makes sense, we explain the trade-off instead of sending one option.
We manufacture and test
Fabrication, welding, polishing and assembly in our own workshop. Standard machines ship in 20 days; a complete line in 40–45 days.
Installation and training
Our engineers travel to site — typically 4 days for installation, commissioning and operator training. Travel and accommodation are covered by the buyer.
Working direct
Why processors buy direct
Controls you can service locally
Siemens components as standard. Where your team needs parts it can source locally, we build to your specified brand — Schneider, Mitsubishi and others on request.
Dairy and liquid egg from one supplier
If your plant runs both a milk line and an egg line, you deal with one supplier, one set of drawings and one spare parts list instead of two.
Sized to your capacity, not to a catalogue
We do not ask you to pick the closest standard model. Tank volumes, heat exchanger area and pump sizing are worked out from the throughput you give us.
Made in our own workshop
Cutting, welding, polishing and assembly happen in our own facility, so a change to a design does not have to be negotiated with a third-party factory.
Material documented with every order
Contact surfaces are SUS304 finished to Ra 0.6 μm, argon-shielded welds, food-grade seals — and a material certificate ships with every machine.
Two-year structural warranty
2 years on tanks, frames and fabricated assemblies; 1 year on electrical and electronic components. Our engineers travel to site for installation and commissioning.
Construction
Built to a standard you can check.
Buyers outside China ask about construction before price: what the contact surface really is, how welds are finished, what happens after commissioning. Here are the answers up front.